Kelloggs, Trafford Park

Kelloggs have been working for years to continually improve their environmental performance, specifically looking at reducing their energy use, greenhouse gas emissions, water use and waste sent to landfill sites.
Part of this process involved surveying the facility, with a view to identifying actions to reduce energy consumption. It became clear that voltage optimisation would be beneficial in reducing the Manchester facility’s energy consumption and offer considerable cost savings too.

Powerdown220 were contacted as a potential supplier, and it emerged that Powerdown220 were the only company that could supply a single optimiser solution.

Data logging allowed us to measure consumption and provide baseline figures. During this process it became clear that the site suffered from large loading swings which made it unsuitable for standard forms of fixed voltage optimisation.
Powerdown220’s optimisers are used to optimise the voltage to a single piece of equipment, localised area or an entire building. They can be supplied with fixed or variable outputs, with or without power factor correction.

In this instance a voltage tracking (stabilised) optimiser was designed to deal with the specific issues identified, and to achieve the maximum possible energy saving. The unit was installed and further data logging carried out to measure the savings.

POWERDOWN220 – MAX PAID FOR ITSELF IN ONLY 21 MONTHS, REDUCING THEIR ANNUAL ELECTRICITY BILL BY £37,500 PER ANNUM

 

• Reduction in Consumption PA  463,176 KWh

• Reduction in Electricity Cost P £40,226.84

• Reduction in CO2 Emissions PA  243 Tonnes

• Total Project Cos £71,061.52

• Payback Period  21.2 Months

Request a Free Survey