Powerdown220

Voltage Optimisation Cuts Costs in the Machinery and Precision Engineering Industry

Voltage Optimisation Cuts Costs and Carbon across the Machinery Manufacturing and Precision Engineering Sectors

  • Voltage Optimisation (VO) has been used extensively in the manufacturing and precision engineering sectors for many years to reduce energy costs on-site. Because of high energy consumption requirements and rising energy costs, VO is quickly becoming one of the most popular energy savings technologies, with many machinery manufacturing and precision engineering companies approaching Powerdown220 to reduce energy costs and carbon emissions.
  • Whilst there is a difference in savings across all electrical equipment in the Mechanical and Precision Engineering Industry based on its voltage dependency, VO tends to make consistently high savings on equipment such as air compressors, extract & ventilation systems, coating and surface finishing plants, cooling and chiller plants, fluid and vacuum pumps, material handling equipment, traditional and CNC machinery etc.
  • Whilst VO does not make a saving on LED lighting for example, it does help to protect the equipment and make it last longer, with an increase in the equipment lifespan of up to 46%, as stated by (UK wiring regs BS7671).
  • Calculating savings for VO is a fairly straightforward process, our technical team completes a full on-site technical survey, to confirm the exact savings made at any particular site.
  • Once we complete a technical survey we can offer a full savings guarantee, meaning if we don’t deliver the savings promised, we will remove the equipment and offer a full refund.

Powerdown220 Reduces Annual Energy Costs at Brother Industries by £41K

  • We partnered with Brother Industries, based in Wrexham who have a dedicated manufacturing division that builds machines, parts and automation equipment.

  • They also have a department that produces machinery parts with CNC machines and 3D printers.

  • By installing a voltage optimiser, Brother not only boosted their bottom line but also reduced their annual carbon emissions by a remarkable 25 tonnes.

  • That’s equivalent to planting 775 trees.

  • Elsewhere, the company also made annual savings worth £41K and saw a return on investment within 18 months.

Annual Spend: £397,028
Annual Savings: £41,468
Annual Carbon Reduction: 25,765 KG
Percentage Savings: 10.44%
Payback: 18 Months

Huge Reductions in Annual Costs and Carbon Emissions For AIS

Guaranteed Energy Savings

  • AIS is a global leader in the engineering, manufacture and application of insulation and passive fire protection systems, buoyancy, and SURF (subsea, umbilicals, risers and flowlines) products. They deliver mission-critical solutions for the energy, industrial, automotive, chemical, and marine sectors. With their annual costs increasing owing to the energy crisis. They turned to voltage optimisation to protect their business from energy cost rises and benefit from its fast payback and stable long-term results.

  • Following a full technical survey, we pledged that the Voltage Optimisers would deliver a minimum saving of 7.22% across three of their UK sites, which was further underpinned by the Powerdown220 Savings Guarantee. With these figures in mind, they were able to budget and plan, helping to protect against their increase in energy costs.

A Stable Power Supply and a 23-tonne Reduction in Carbon

  • In addition, AIS is also benefiting from a more stable power supply on-site, with their equipment only drawing the energy that it needs to run at its optimal level, rather than having to work harder due to excess energy from the grid.

  • As a result, the voltage optimiser will help increase the lifespan of the equipment and save on future expenditures by reducing ongoing maintenance and replacement costs across the company. The voltage optimiser has also reduced their carbon footprint by 23 tonnes of harmful carbon emissions a year.

Annual Spend: £658,914
Annual Savings: £48,000
Annual Carbon Reduction: 23,165 KG
Percentage Savings: 7.22%
Payback: 14.6 Months

Powerdown220 Reduces Carbon Emissions by 41 -tonnes at Domino Printing Sciences

  • Domino Printing’s Cambridge site approached Powerdown220 to find ways of reducing their energy bills and carbon footprint, by improving energy efficiency.

  • Domino Printing, design and manufacture industrial and commercial inkjet printers, thermal transfer printers, print and apply machines, digital printing presses, and laser printing products.

  • Their products cover industries such as food and beverages, commercial printing, corrugaters, life sciences, tobacco and industrial.

  • They are committed to operating responsibly and sustainably to help protect the environment. They committed further to the environment by optimising their voltage on-site, and as a result reduced their annual carbon emissions by 41-tonnes.

Annual Spend: £947,981
Annual Savings: £68,984
Annual Carbon Reduction: 41,248 KG
Percentage Savings: 7.53%
Payback: 12.7 Months

WLR Precision Engineering

  • Annual Spend: £86,787
  • Annual Savings: £8,401
  • Project Cost: £12,859
  • Payback: 18 months
  • Percentage Savings: 9.68%
  • Annual Carbon Reduction: 24,100 KG

VTL Precision

  • Annual Spend: £188,853
  • Annual Savings: £16,853
  • Project Cost: £28,436
  • Payback: 1.7 years
  • Percentage Savings: 8.93%
  • Annual Carbon Reduction: 27,435 KG

IrvinGQ

  • Annual Spend: £167,203
  • Annual Savings: £21,602
  • Project Cost: £36,487
  • Payback: 20.3 months
  • Percentage Savings: 12.91%
  • Annual Carbon Reduction: 61,163 KG

Interplex PMP Eliminate Overspending on Excess Voltage

Improving Operational Efficiency

  • Interplex PMP based in Arbroath, Scotland a leading manufacturer of interconnect and mechanical products. They supply products to the mobility, medical, information, and communications industries. Their commitment to environmental responsibility and operational efficiency led them to explore innovative solutions.
  • Interplex PMP sought a solution to enhance their energy efficiency without compromising the productivity of their manufacturing processes. They aimed to implement sustainable measures that would contribute to their corporate social responsibility goals and reduce their carbon footprint.
  • The PowerDown220 technical team conducted a comprehensive energy audit at Interplex PMP to assess the facility’s voltage profile and energy usage patterns. Based on the findings, a bespoke voltage optimisation solution was built and seamlessly integrated into the facility’s existing electrical operations. The installation process was executed with minimal disruption to ongoing operations.

Annual Spend: £534,134
Annual Savings: £37,169
Annual Carbon Reduction: 106,268 KG
Percentage Savings: 6.9%
Payback: 23 Months

Our partners

Here are some of the companies we are proud to have worked with

Testimonials

We supply voltage optimisers to businesses across the UK in every sector, from manufacturing to hospitality.

You can find out how much we can save your business today by filling out our enquiry form.

Get in touch
Please enable JavaScript in your browser to complete this form.
Please enable JavaScript in your browser to complete this form.